Commit Graph

1 Commits

Author SHA1 Message Date
Codex
8babce893c VIOLET OA: partial spec PASS 2 — spec-advancing self-contained tasks
VIOLET_PART_SPEC_OA_TODO_PASS2.md — four new-file-only tasks that advance the main V0→V6 ladder
toward the DARK-soak gate and V4, each painstakingly specified (why/spec-link, exact new files,
approach, tests, pass criteria), under the same HARD RULES + COMMIT/BRANCH policy as PASS 1:
  4. Live BLUE↔VIOLET decision parity report (V3d → soak-readiness gate; reads CH, no writes).
  5. Full-DecisionEngine reactor latency gate (V0/V3 budget proof with the real 5-factor brain).
  6. L3 tradeability projector standalone (V4 prep; ShadowDecision → exchange-leverage projection,
     DARK, not wired to venue/journal).
  7. Deterministic replay + golden gate (V3d determinism criterion; same scans ⇒ same decisions).
Independent/parallelizable; recommended order 5→7→4→6. None need the operator's soak/keys
greenlight. PASS-1 tasks reported done — review deferred (noted).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-16 23:44:30 +02:00